Brinkman Partners

Portfolio: Under Construction

top
Brinkman Project

The Exchange

Fort Collins, Colorado

Downtown Mixed-Use Development

Developer:

Brinkman

Design Team:

alm2s Architects

Construction Duration:

12 Months

Total SF:

53,000

 

[ + ] More Info

Project Details

The Exchange is located in the heart of Fort Collins and is set to reinvigorate this historic block through the creation of an open-air central quarter and reimagined buildings.. Inspired cuisine, craft cocktails and beer will be served via shipping container cars. This innovative concept is new to Fort Collins and repurposes shipping containers to house pop-up-style restaurants and bars. Complete with open air communing areas, mercantile and entertainment, this will be the new destination for family-friendly leisure.

Brinkman Project Brinkman Project
   
   
   
   

[ X ] Close

top
Brinkman Project

The Foundry

Loveland, Colorado

Downtown Mixed-Use Development

Developer:

Brinkman

Design Team:

OZ Architecture

Construction Duration:

14 Months

Total SF:

415,000

 

[ + ] More Info

Project Details

The Foundry redevelopment will provide a 100 room hotel and more than 140 urban living units surrounding a large central plaza for gathering and entertainment. A parking garage with over 450 spaces will support 56,000 square feet of new office space. A movie theater with five screens and 625 seats will contribute to the family-friendly feel of the new downtown destination. Complete with ground floor retailers along Cleveland and Lincoln Avenues, the revitalized city blocks will provide many attractive urban amenities to locals and visitors.

Brinkman Project Brinkman Project
   
   
   
   

[ X ] Close

top
Brinkman Project

Oakridge Crossing

Fort Collins, Colorado

Affordable Senior Housing

Developer:

Lexton-McDermott

Design Team:

Lewis Himes Associates

Construction Duration:

12 Months

Total SF:

90,000

 

[ + ] More Info

Project Details

This 110 suite affordable senior housing development includes ground floor commercial flex space, and amenties including: horseshoe pit, billiards room, shuffle board, and gym. The building will be constructed with wood framing over a post-tension concrete slab on grade.

   
   
   
   
   

[ X ] Close

top
Brinkman Project

Windsong at Rock Creek

Fort Collins, Colorado

Memory Care Facility

Client:

Vista Pointe Development

Design Team:

Lenity Architecture

Construction Duration:

10 Months

Total SF:

37,621

 

[ + ] More Info

Project Details

This project incorporates 64 beds for residents in a secure facility with multiple amenities. The building is comprised of two wings with separate courtyards including water features. The two wings share a central kitchen, staffing areas, medical facilities, lobby, and porte cochere.


The facility uses finishes such as permeable pavers, stone veneers, and wood columns.

 

   
   
   
   
   

[ X ] Close

top
Brinkman Project

Affinity

Fort Collins, Colorado

Senior Living Apartments

Client:

Inland Group

Design Team:

Nystrom + Olson Architecture

Construction Duration:

14 Months

Total SF:

169,891

 

[ + ] More Info

Project Details

This 161-unit independent senior living facility will have three stories and a 20,000-square-foot poolhouse. The facility will feature a full amenity suite for tenants. Amenities will include a clubhouse offering a library, theater, internet cafe, fire pit, pickleball court, pool, and 14 garage buildings.

Brinkman Project Brinkman Project

[ X ] Close

top
Brinkman Project

Stadium Apartments

Fort Collins, Colorado

Student Housing

Client:

Student Housing, LLC

Design Team:

Knothe & Bruce Architects

Construction Duration:

15 Months

Total SF:

246,914

 

[ + ] More Info

Project Details

This five-story student housing project is ideally located one block west of the new Colorado wState University football stadium. With 102 units consisting of two-, three-, four-, or five-bedrooms, the new multifamily project will have 388 total bedrooms. Each unit includes a patio or deck and nine foot ceilings.


In addition to a subterranean parking garage, the complex includes a community room, exercise room, pool, hot tubs, fire pits, grill and barbecue area, and a rooftop common plaza.

   

[ X ] Close

top
Brinkman Project

Rangeview V

Loveland, Colorado

Class A Office Building

Client:

McWhinney

Design Team:

RNL Architects

Construction Start:

May 2016

Construction Finish:

April 2017

Total SF:

120,000

 

[ + ] More Info

Project Details

This four-story office building is located within the Centerra development in Loveland. The project is intended for a Class A office tenant and features mountain views and a lakeside location.

   

[ X ] Close

top
Brinkman Project

Harmony Commons

Fort Collins, Colorado

Neighborhood Retail Center

Client:

Brinkman

Design Team:

r4 Architects

Construction Duration:

7 Months

Total SF:

25,646

 

[ + ] More Info

Project Details

This retail center is positioned prominently in southeast Fort Collins, with high visibility and immediate access from Harmony Road. The first phase of the project includes two buildings of inline retail. The project will also include a hotel and office spaces in later phases of the project.
The location places the project just off I-25, adjacent to Banner Health Hospital, and down the street from Fossil Ridge High School.

The building is constructed using wood framing with steel structure and finished with a mixture of metal paneling, wood paneling, stucco, and masonry.

For more information, please visit: harmonycommons.com

   